Optima Engineering

Featured Project – Local Government Credit Union Office

Optima Engineering teamed up with Gensler Raleigh to help transform this outdated, traditional financial institution into a State-Of-The-Art, modern facility. The existing building is an approximately 100,000 square foot facility, with many systems already in place, however all equipment had to be replaced due to age and current code compliance requirements. The building was fitted with a new Building Automation System using DDC technology to control all of this new equipment. Existing lighting was removed as it was old and inefficient, and was replaced with LED fixtures. The plumbing system needed to be replaced to conform with new code regulations, therefore new water-efficient fixtures were installed.

Design Highlights:

  • 100,000 SF, 4-story office building renovation
  • All equipment replaced to comply with current building code requirements
  • New Building Automation System using DDC Technology
  • High-efficiency air-cooled chiller
  • 4-pipe chiller water & boiler system
  • New LED light fixtures
  • Fire alarm replaced with new addressable system
  • Stand-by 1250Kw diesel powered generator

Gensler Raleigh

Gensler Raleigh

Gensler Raleigh

Gensler Raleigh

Gensler Raleigh

Gensler Raleigh

Gensler Raleigh